Pages

Monday, September 27, 2010

from the L E A K S project || Jim Leftwich

. found
. found a ecording The terrain stru
will be submitted lore OR DAMAGES #-(CLOSED)
BAR:* inde ny infrastructure and a r
/DUPLICA x Torpedoes on a IN, bein
support is r esulted in no damage to a
bunker. disco *** SUMMARY *** L COY 3/4
and there * Th re being destroyed. Banga
. deny th engagement. This to the r
the IN to use (E cture future. the structu
: BUNKER clo was conducting an fired 2
: * 3/4 LIMA is av g an IN bunker by. fired
use of the was hea LT were no AS. EN BUNKER
conduct a full. equest to conduct a full.
IN (2) BANGALORE SA e IN use of the was hea
no AS. EN BUNKER sed at: * 3/4 LIMA is av
IN bunker by. fired TE DESTROYED: BUNKER clo
an fired 2 IT deny the IN to use (E
. the structu vered REPORTED. deny th
to the r vy urban and there * Th
destroyed. Banga ES Follow bunker. disco
*** L COY 3/4 ailable. up support is r
no damage to a mail) ADDITIONAL/DUPLICA
on a IN, bein resulting in BAR:* inde
and a r on IT will be submitted
DAMAGES #-(CLOSED) pendent patrol. found a
terrain stru sed at: * 3/4 LIMA is av



. found * 3/4 LIMA
. found a ecording The
will be submitted lore OR )
BAR:* inde ny infrastructure and
/DUPLICA x Torpedoes on a
support is r esulted in no damage
bunker. disco *** SUMMARY *** L
and there * Th re being
. deny th engagement. This to
the IN to use (E cture future.
: BUNKER clo was conducting an
: * 3/4 LIMA is av g an IN bunker
use of the was hea LT were no AS.
conduct a full. equest to conduct .
IN (2) BANGALORE SA e IN use of the
no AS. EN BUNKER sed at: * 3/4 LIMA
IN bunker by. fired TE DESTROYED:
an fired 2 IT deny the IN to
. the structu vered REPORTED.
to the r vy urban and
destroyed. Banga ES Follow
*** L COY 3/4 ailable. up support
no damage to a mail)
on a IN, bein resulting in
and a r on IT will
DAMAGES #-(CLOSED) pendent patrol.
terrain stru sed at: * 3/4 LIMA



a
a ecording
be submitted lore )
:* inde ny infrastructure
x Torpedoes on
is r esulted in no
. disco *** SUMMARY ***
there * Th re
th engagement. This
IN to use (E cture .
clo was conducting
LIMA is av g an IN
of the was hea LT were no .
a full. equest to .
(2) BANGALORE SA e IN use of
AS. EN BUNKER sed at: * 3/4
bunker by. fired TE :
fired 2 IT deny the IN
structu vered .
the r vy urban
. Banga ES
COY 3/4 ailable. up
damage to a )
a IN, bein resulting
a r on IT
#-(CLOSED) pendent .
stru sed at: * 3/4



submitted )
submitted )
:* ny
Torpedoes
r esulted in
. *** ***
* Th
engagement.
N to use (E .
was
is av g an
the was hea LT were .
full. equest .
(BANGALORE SA e IN use
. EN BUNKER sed at: *
by. fired :
2 IT deny the
.
r vy
.
3/4 ailable.
to )
IN, bein
r on
) .
sed at: *

No comments:

Post a Comment